Operation Volcano
Italy | 2019A client commissioned us to build a new production site.
We installed eight presses, between 160 and 1,200 tonnes. For those presses we developed specific automations, and installed all the services for the factory (including the overhead crane, power supply system, cooling system and other ancillary systems).
In four months we started up production and in the following six months we optimised the process.
Operation Ceres
Africa | 2019We were responsible for the design and construction of a production site for manufacturing plastic roof tiles from recycled materials.
Operation Vesta
Europe | 2016We were asked to redesign the internal layout of a factory with the aim of maximising space, adding new presses and improving production.
In just three months, we relocated eight presses, ranging from 160 to 4,000 tonnes, and installed a new press in the resulting space.